VIDYALAYA INFRASTRUTURE
STATUS OF INFRASTRUCTURE IN JNV’S
 
I
Area of land  allotted (in acres)
 
Whether land transferred in the Name of Samiti
 
Vidyalaya shifted to permanent buildings on 
:  30 Acres
 
:  Yes
 
 
:  May-1998
 
ii
Status of Boundary Wall
 
a.  Brick Wall
b.  Barbed wire fencing 
: (Completed / Incomplete)
 
Brick Wall Completed 
iii
Permanent buildings constructed 
: (CBRI pattern/ CPWD pattern)
 
CPWD Pattern
iv
School building
: Complete / Incomplete
  Completed 
v
Dormitories
 
:  Boys 336 (08) Nos.
   With Warden Residence 07 Nos.   
:  Girls 240 (04) Nos.
   With Warden Residence 05 Nos.  
vi
Kitchen/dining Hall
 
No. of shifts required for all students  to take food  
:  Complete, Area ______
 
Two Shifts 
vii
Principal Residence  
01 No. 
viii
Staff Quarters
 
 
 
 
: Type III =   16 Nos.
  Type II =     --- Nos.
  Type  I  =    12 Nos.
  SP Sheds converted into Staff Qrs.: 00 Nos.  
ix
M.P. Hall 
: Not available
x
Workshop  
: Not available
xi
Type of O.H. Tank
 
Its capacity
 
Present Status 
: Shaft type / Column based
 
:  1.35 Lakh litres
 
: Working satisfactory
xii
U.G. tank
 
Its capacity
 
Present Status 
 
:  1.35 Lakh litres
 
: Working satisfactory
xiii
D.G. Set
:  Available
: Kirloskar make
: 15 KV
: Working
: Year of procurement – 22.06.2001 
xiv
Sewage Pump 
: 01 No. 7.5 H.P.
xv
Water Pump 
: 3 Nos. 7.5 HP capacity
xvi
Electrification
 
Electric connection
Sub Station building
Street lighting
 
Numbers of hrs. During day when power supply is available on an average.
 
 
 :  Urban Feeder 160 KVA
:  Complete
: __________ Nos. of Poles
 
: 20 hrs.  
xvii
Playfields
400 metre track
40 x 30 metre basket ball court
40 x 30 metre volley ball court 
 
: Not available
:  04 Nos.   – Available
:  02 Nos.   – Available 
xviii
Water supply
Tube Well
Hand pump
Connection from PHED 
 
: Potable,  03 Nos.-  working
: Potable,  02 Nos.-  Not working
:  01 hours supply in a day
xix
Rajiv Gandhi Smriti Van 
:  Available
xx
Fire fighting arrangement 
:  Working Installed on 01.01.2018

Mess – 2

Office – 1

Generator Room – 1

Electric Room – 1

Chemistry Lab - 2
xxi
Last date of cleaning of
(a)    Septic tank
(b)    Water tanks
 
:  May 2018
:  May 2018
xxii
Whether area around transformer is fenced
:  Yes 
xxiii
Whether open wells, if any, are covered from top
:  Yes
xxiv
Works taken up under M&R fund during current year and last year:- 
:
Year
Name of work  (M&R)
Expenditure
(Rs. In lacs)
Cumulative expenditure during the year
 -  -
-
 -